Browse By Tags

  • Open Bridge Designer Leap Bridge Steel - Partial Length Girders

    I am pretty new to using Leap Bridge Steel, and have a question regarding a project I am working on. I have attached a general framing plan, and was wondering if Leap Bridge Steel was capable of modeling it, mainly due to the partial length girders. The…
  • What's New in RM Bridge CE V11 Update 9 (included in OpenBridge Designer CE V10.08.02) and RM Bridge CE V11 Update 8 Maintenance Release 1?

    RM Bridge CONNECT Edition V11 Update 9 (V11.09.00.XXX) contains the following enhancements and error corrections: BIM Workflow: Revised Model Transfer from OpenBridge Modeler (OBM) BIM Workflow: Import and Update Build Order for Segmental Bridges…
  • Release Announcement: RM Bridge CONNECT Edition V11 Update 8 (V11.08.00.29)

    We are pleased to announce the release of RM Bridge CONNECT Edition V11 Update 8 (V11.08.00.29), which is now available on Bentley’s Software Fulfillment Center. This release includes the following features to enhance BIM workflow, user experience, and…
  • SIG Virtual Workshop: OpenBridge – Workspace Configuration in OpenBridge Designer

    Title: SIG Virtual Workshop: OpenBridge – Workspace Configuration in OpenBridge Designer Presenter: Steve Willoughby, Senior Application Engineer, Bentley Systems, Inc. Date/Time: June 11, 2020 2:00 P.M. EDT Register Now This OpenBridge…
  • SIG Virtual Workshop: OpenBridge – Modeling and Analytics, New Features in OpenBridge Designer

    OpenBridge Special Interest Group: OpenBridge – Modeling and Analytics, New Features in OpenBridge Designer Host: Alex Mabrich User Success Manager, Bridge & Tunnel, Bentley Systems, Inc. Date/Time: May 12 2020 02:00 P.M. EDT Register Now …
  • New Release! RM Bridge CONNECT Edition V11 Update 7, (Nov 2019 - Release 3)

    RM Bridge CONNECT Edition V11 Update 7 (V11.07.00.12) includes the following enhancements and error corrections: Reinforcement Design -Phase I New Takeda Hysteretic Spring Element New Action (SupCoex) for Reporting Concomitant Envelope Results…
  • Release Announcement: RM Bridge Concrete CONNECT Edition V11 Update 6

    RM Bridge Concrete CONNECT Edition V11 Update 6 includes important features to enhance BIM workflow, user experience, and product performance: BIM Workflow: Transfer Cross-frames from OpenBridge Modeler (OBM) to RM FEM Enhancements: Composite Forces…
  • SIG Workshop: Bentley Bridge – April 11, 2019 – You're Invited!

    SIG Workshop: Bentley Bridge: Rolling Stock Analysis for High-Speed Rail Bridges Presenter: Alex Mabrich, Senior Application Engineer, Bentley Systems, Inc. April 11, 2019 @ 2 p.m. EDT (U.S.) Register Now Learn the latest in Rolling Stock…