  • the effect of cable sag

    Hi all. How does RM Bridge consider the effect of cable sag? Best regards.
  • allowable displacement of towers under live load

    Hi all. In the design of a cable-stayed bridge, what is the allowable displacement of the A and H shaped towers under live load? Best regards.
  • Steel composite bridge

    Hi all. I hava some question about steel composite brige as follows: 1. To calculator stress point of section, Rm Bridge automatic use short-term section for live load and load case type Non-permanent and use long-term section for load case type Permanent…
  • Use No tens and ReloadSup functions in RM Bridge

    Hi all. in steel girder bridges combined with concrete decks (continuous span girder bridges). If the concrete deck is not in tension and the combination of internal forces according to the Service limit state is service.sup, then use the ReloadSup function…
  • allowed deflection of the bridge under the effect of live load

    Hi all. Nice to meet you. I have a model steel composite cable-stayed bridge with 6 span continuos by Rm Bridge V8, 2 side span have 150m, 4 main span is 300m. I don't known about allowed deflection of the bridge. I use AASHTO LRFD standard. If you…
  • Reinf crack for prestressed concrete

    Hi all. I have a question about Reinf crack for prestressed concrete as follows: If you calculator stress bot of section beam in MinMz_Service exceeding allowable stress tension limit is 0,5 x sqrt(f'c), you can calculator reinf area to control crack…