I uploaded the ALG, ird, existing ground tin, rdp, gpk, and two cross-section dgns in the 0261020.zip folder. In the Clark_xsd.dgn Topsoil is drawn correctly at station 2+00 and earlier, and then when milling is added at 2+25, the topsoil disappears.…