Browse By Tags

  • RC-Pier LEAP Bridge: Column Seismic Shear Design

    Hello - I am modeling hammerhead piers in RC-Pier Version 20.00.00.58. EQ/ES/LS loads are applied at the bottom of the column with a user-defined seismic load combination. For some piers, the seismic shear output at the top of the column shows Combo …
  • Circular Column Interaction Diagram

    Hello. I'm wondering how LEAP Version 21.01.00.22 calculates the maximum axial load displayed in the diagram. The diagram displays a maximum axial force allowed of 1802 kips. As expected the 1802 kips doesn't change regardless of the load combination…
  • One Way Shear Abutment Footing on Piles Leap Concrete

    Hello, I have 95 ft long and 12 ft wide abutment footing on 2 rows of piles. Abut stem is 88 ft long. How is the Leap program calculating Dist (ft) , dv, Vu and Phi Vc for X and Z ? I will appreciate the response. Thanks,
  • RCPier - Response Modification

    I am using Leap Concrete Version 18.02.02.03 for a multi column pier design that includes seismic forces. I need to apply a response modification factor for the columns and the help guide states that this can be modified in the Seismic Parameters. However…
  • Leap bridge concrete

    Hi I have modeled multi column pier with ABC modelling and when i am analyzing Pier, it is not performing analysis and giving error Frame is unstable. Please help me and if you guys have time to check. Thank you Vivek Kushwah +91-7974638191…
  • Multi column pier in Leap bridge concrete

    Hi All I am modelling and designing multi column pier in Leap, But after applying loads i am getting ambiguous bending moment, also huge reinforcement is showing on designing. Please find the model attached and any one please can help and check the…
  • Leap Bridge Concrete Wall Pier - Moments at bottom of wall

    I am using Leap Bridge Concrete to design a skewed wall pier. After analyzing the pier, I noticed that for the braking force, that the sum of the forces in the z-direction at the top of the wall did not equal the sum of the forces in the z-direction at…
  • Bearing Spacing Dimensions Differ Between Main Bridge Model and Substructure Module

    I am designing a 2-span precast prestressed beam bridge in LEAP Bridge Concrete CONNECT Edition v17.00.01.01. The bearing dimensions along the pier cap are shown correctly in the following view under the 'Substructure' tab: However, when you click…
  • LEAP Bridge Substructure/RC-Pier LFD Live Loads in the Negative Moment Region

    I am using the LEAP Bridge Substructure module to design a pier for a continuous 4 span structure using HS20 LFD loads. In the AASHTO Standard Specifications, it gives you a few options for the loading. One is that you can use a lane load with one concentrated…
  • Live Load Surcharge

    How exactly should the vertical component of LL surcharge on the footing be input? I have a 100 ft long footing (x dir) with a 9.75 ft heel (z dir). Per AASHTO, I'm using the equivalent of 2 ft of soil for the surcharge. There's 80 ft of clear roadway…
  • RC-PIER Live Load Auto-generation verification

    Does anyone have calculation verification for the live load auto-generation function in RC-PIER? Or has anyone else had problems verifying the LL output from RC-PIER?
  • Wind Load Auto Generation

    I have created a Leap Bridge Enterprise file consisting of a 3 span precast girder Conspan Model, and single column bents with bent caps created in RC-Pier. I'm trying to generate WS loads from the Auto Generate feature. I assume the Wind Pressure for…
  • RE: Solid Wall Pier

    Hi, I'm also trying to model a solid wall pier using LEAP RC-Pier V12.01.00.57. This version has the 'Wall Pier' option, however the generated wall design is coming up with rather impractical reinforcement layouts (#18 @ 12") oriented parallel to the…
  • Solid Wall Pier

    What is the best way to model a solid wall pier using RC Pier? I am thinking there are two possibilities: 1) Model short cap (1' height or less) and one column (non-tapered in x and z direction) centered on footing 2) Model short cap (1' height…
  • Auto-generation of wind load on structure (WS) per FDOT Structures Design Guidelines (SDG) 2013

    One of the new features added to the latest RC-PIER is the comprehensive auto-generation of WS loads and load combinations per the FDOT SDG 2013: An option for WS load auto-generation is now offered under the “Loads” tab. FDOT strength and service…
  • How to obtain the out-of-plane governing load case in the report of pile lateral resistance

    A few RC-PIER users recently asked questions about the two analysis options in the abutment design and the related footing design reports. Here is some clarification. In abutment design, when "Cap as continuous beam" is selected for the frame analysis…
  • Re: RC-Pier Load Input

    This feature has already been added in RC-PIER and will be in v09.00.00.xx scheduled for release in May 2009. Users will be able to specify a text file from which the values can be read in from. This feature will be available for both LFD and LRFD, and…