Browse By Tags

  • Using LoadBuilder to assign customer meters to nearest pipe

    I am trying to assign demands to junctions using the LoadBuilder tool, I am using internal data through uploaded customer meter data and I have made sure that the base demand for the customer meters is filled. but after I assign the customer meters to…
  • Doubt in Watergem node demand

    Hi Guys, I have a doubt in my water gem model. Currently, we are working in the industrial area project, So Each building has specific demand. I provided specific demand to the relative required nodes. My doubt their lot fo nodes has no demand required…