Browse By Tags

  • Synchro Control Network Error

    I have uploaded an iModel to Synchro Control and when I try to view it, I am getting a network error and Synchro Control says there is no iModel uploaded. However, when I try to upload again, it makes me delete the old Model first, so there is obviously…
  • 3D view limitations? - Synchro 4D Pro

    Hi all, For my current projects (last 2 and since the renewal of our Synchro 4D pro license) I'm experiencing that certain surfaces are invisible from above but not from below. Also certain faces of random objects (mostly masses from Revit) For each project…
  • Synchro 4D Schedule Dates Changing?

    I am having issues with my dates not sticking when being changed in Synchro 4D. I have updated these dates and saved them properly only to open the file later and the dates have changed back to what they were before. Has anyone else had this issue before…
  • Optimization of SYNCHRO

    Good afternoon, are there any life hacks or secrets to speed up the work with the model in SYNCHRO? The uploaded model had the IFC format Now there is no possibility to change the computer, but I want to somehow speed up work with the model
  • Can I animate one window while the other stays stagnant in a split view animation?

    I am trying to export an animation with 2 separate 3D views: 1 following the camera angle of the animation timeline and the other staying stagnant at a more bird's eye view. How do I go about executing this?
  • Excel Schedule Could not be Read or Imported

    When attempting to import my construction schedule that was made in Excel, I get this error message. I have not changed anything about my formatting or settings but I am using Synchro 4D Pro for the first time rather than the older version of Synchro…
  • Workflow propositions for status updating of MEP installations on-site via Synchro Field

    Good day, I am struggling to find any material/sources on the status tracking of MEP installation works on-site via Synchro Field. While utilising the status update feature in Synchro and Synchro field for structural elements seems reasonable and…
  • The formula of the UF. Length

    Hi! I use the formula as in the screenshot below to output the maximum value from length, width and height, but the formula does not work. MAX(CALCULATE_X_SIZE, CALCULATE_Y_SIZE, CALCULATE_Z_SIZE) What could be the problem? Are there other ways…
  • Why the picture doen't see?

    i did the Dynamic Clash Detection setting like under picture. And the test is successful. After clicking the Export button, no pictures of the crash detection report are displayed. but after clicking the Print button, the report picture are displayed…
  • Opening linked SYNCHRO .spx file after upgrading from Pro 6.3.2.0 to 4D Pro 6.4.3.2

    Hi, as a channel partner received this question about Synchro: Opening a Synchro file with a linked SYNCHRO .spx file after upgrading the desktop application from Pro 6.3.2.0 to 4D Pro 6.4.3.2 creates a warning; how can this be solved? (Should the…
  • Hello. I have question in 3D Path/Keyframe

    Hello. My synchro program is weird. '-nan(ind)' was created in the keyframe list to create the 3D Path. It does not apply to 3D objects when moving or rotating the keyframe. Only the front two of the keyframes can be modified, and the rest cannot…
  • Export 3D is finished by failure with .spm format

    I am currently trying to export the synchro pro project at .spm format for 3D repo. However, the following error shows up and no file was created. The following would be the version I am using and the export setting. Please help.
  • Power BI Connector - All Resource Statuses are not available

    Hi, I am testing out this power BI data connector on a project, for this project I've statused 221 objects in synchro 4D pro but in Powerbi only 8 items are showing up in the "Resource Status" sheet. Also, FYI I've updated these statuses 2 hours back…
  • Resource Statuses - Unable to change the order of status sets

    Hi, I want to organize these status sets but for some reason, this move up/down button is disabled. What's the issue here? Thanks
  • SYNCHRO AWP

    Hello! I am interested in the topic of AWP and the relationship with SYNCHRO. How is the relationship between SYNCHRO and AWP implemented? (a question on a similar topic - Synchro 4D Pro and Synchro AWP - SYNCHRO Forum - SYNCHRO Construction Solution…
  • When is the Power BI connector coming? It has been rumored for a very long time, and promised, but it has been almost a year.

    It has been rumored for a very long time, and promised, but it has been almost a year. When is it coming?