Browse By Tags

  • short-term and long-term composite cross-section

    Hi all. In composite steel girder bridges with concrete decks (continuous span bridges), does RM bridge automatically Calculator effective width of deck to calculate short-term and long-term composite cross-sections? best regards.
  • Steel composite bridge

    Hi all. I hava some question about steel composite brige as follows: 1. To calculator stress point of section, Rm Bridge automatic use short-term section for live load and load case type Non-permanent and use long-term section for load case type Permanent…
  • Zero Steel Area provided at transfer

    Hello, I have a problem in the beam section analysis. I assigned rebars to the beam but the program says I have "0 Ast_prvd" at the transfer location and I want to know if there is any way to fix this or if there is a special setting I should look for…
  • Arch Bridge - Rm bridge

    hello Everybody! At this time! Can you help me? How to draw " this member " of Arch Bridge in Rm-Bridge? Note: only is red lines in the picture.
  • Detailed Design of Bridge with OBM (Open Bridge Modeller)

    Hi Experts, I am new to OBM, I have done a few tutorials from online learning material. I wanted to know if OBM is the solution to Bridge modeling? Could you do the full detailed design of the bridge including all the components? (eg. On-Structure…
  • LEAP Bridge - Precast/Prestressed Girder - 10th points

    Hello, Camber and deflections are reported at 10th points along the beam. I am modelling a longer span which will require more than 10 screed points. Is there a way to toggle the number of points? Or do I have to interpolate? Thanks,
  • how to make template?

  • Detensioning Failure

    I have a single span bridge using I-girders that I need close to the max amount of strands in. These are all straight strands, and I've had to debond to 4 different lengths from the end. The longest debond is 25' of my ~90' girder. When I look at the…