Browse By Tags

  • Displacement vs different time does not match in tutorial 8

    From tutorial 8: construction of a road embankment, create curves of displacement uy and time. At the first consolidation (phase 2), the time interval is set at 300 days and 20 days to compare. The question are: - Why do 2 curves not match each other…
  • Tunnel _ volume strain input

    Hi all, I was modelling the volume expansion (due to temperature change) by inputting the volume strain of material directly. But when I consider the tunnel, I cannot input the volume strain value to the lining ( plate material), so it shows the wrong…
  • Underground pipe settlement for B31.4

    I have a 12" valve station, above ground, on top of a new berm. The berm settles 2". Adding that info to the aboveground supports is straightforward. There is a 2" drain line that goes from the 12" line straight underground, down about 3', then turns…
  • Prescribed displacements

    Application PLAXIS 3D Version PLAXIS 3D 2010.01 Date created 09 May 2011 Date modified 09 May 2011 The different uses of prescribed displacements are explained in this video. To demonstrate how to apply displacements…
  • Q. Displacement of piping with soil properties is very large, as if the soil properties are not considered during the analysis, why?

    Applies To Product(s): AutoPIPE Version(s): 2004, XM, V8i Area: Modeling Original Author: Bentley Technical Support Group Date Logged & Current Version Feb. 2015 09.06.01.10 Problem…