Browse By Tags

  • Displacement vs different time does not match in tutorial 8

    From tutorial 8: construction of a road embankment, create curves of displacement uy and time. At the first consolidation (phase 2), the time interval is set at 300 days and 20 days to compare. The question are: - Why do 2 curves not match each other…
  • How do i model footing to measure the bearing capacity and consolidation using PLAXIS 3D V21

    Hello. I am new to PLAXIS 3d V21. I have been learning PLAXIS 3D V20 which seemed to be much simpler than the current V21. I wanted to design a shallow footing setting on the ground surface. I want to measure the bearing capacity of the ground and…
  • Providing interface to cylindrical volume Deep Mixed column

    Hello, I am doing PLASXIS 3D analysis for the Deep Mixed (DM) column installed in soft soil under the embankment load. DM columns are made by extruding a cylindrical volume and replacing the soft soil material with the DM column material. The soft soil…