• "The target peak is greater the inflow hydrograph peak..."

    Jesse Dringoli
    Jesse Dringoli
    Product(s): PondPack Version(s): V8i, CONNECT Edition Area: Modeling Problem When trying to compute PondMaker step 2, the following user notification appears: "The target peak X ft³/s is greater than the inflow hydrograph…
    • over 4 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • Accounting for bypassed (undetained) flow in PondMaker

    Jesse Dringoli
    Jesse Dringoli
    Product(s): Bentley PondPack Version(s): V8i, CONNECT Edition Area: Modeling Problem In the Postdevelopment conditions, some of the flow that was discharging to my site outfall bypasses my detention pond. In other…
    • over 3 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • How can I set up pre and post development scenarios for use in pond design with PondMaker?

    Jesse Dringoli
    Jesse Dringoli
    Applies To Product(s): Bentley CivilStorm, Bentley SewerGEMS Version(s): 08.11.XX.XX Area: Layout and Data Input Original Author: Sushma Choure, Bentley Technical Support Group Problem How…
    • over 6 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki