• SIG Virtual Workshop: OpenBuildings Designer – Good Drawings Still Matter

    Kelly Fox
    Kelly Fox
    Title: SIG Virtual Workshop: OpenBuildings Designer – Good Drawings Still Matter Date/Time: July 21, 2020 11:00 A.M. EDT Co-Presenters: Mary Chib, Senior Content Engineer, Bentley Systems, Inc and Paul Wagner, Senior Content Engineer, Bentley Systems…
    • over 3 years ago
    • OpenBuildings | AECOsim | Speedikon
    • OpenBuildings | AECOsim | Speedikon Announcements
  • Revit Export Error

    Abdul Shaheed Pk
    Abdul Shaheed Pk
    Dear Synchro Users I am Abdul Shaheed working in a maritime city project. we have around 300 buildings. I have an issue with few project facilities (not all) . I cannot figure out it. 1: I exported from Revit to synchro with shared coordinated checked…
    • over 3 years ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Workflow to create 4D simulation for a road

    Raul Valdivieso
    Raul Valdivieso
    Is there a workflow to link my OpenRoads Designer model with a schedule in Synchro Pro to get a 4D simulation? How should I export my model? Has anyone manage to do that? Thank you very much.
    • over 3 years ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Workflow for 4D simulation with Synchro

    Raul Valdivieso
    Raul Valdivieso
    Is there a workflow to link my OpenRoads Designer model with a schedule in Synchro Pro (or other software) to get a 4D simulation? How should I export my model? Has anyone manage to do that? Thank you very much.
    • over 3 years ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • Webinar: OpenBuildings Designer - Zeit für eine digitale Umstellung – Upgrade von CAD auf BIM - Aufzeichnung anschauen

    Johannes Lerch
    Johannes Lerch
    Webinar: Zeit für eine digitale Umstellung – Upgrade von CAD auf BIM Termin: Freitag, 5. Juni 2020, 11 Uhr Referenten: Karsten Pudziow, Senior Consultant und Johannes Lerch, Product Manager Jetzt Aufzeichnung anschauen! Dabei geht es um folgende Inhalte…
    • over 3 years ago
    • OpenBuildings | AECOsim | Speedikon
    • OpenBuildings | AECOsim | Speedikon - Forum (Deutsch)
  • Using SS2 DTM Feature names in an ORD Terrain for Corridor Point Control

    David E. Stewart
    David E. Stewart
    I have a number of legacy InRoads SS2 projects where the project data will have to be moved to the current version of ORD . The designer(s) at the time made extensive use of feature point controls as well as other advanced SS2 features. Without maintaining…
    • over 3 years ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • OpenBridge Modeler - Advanced Bearing Definition

    Sri
    Sri
    Advanced Bearing Definition in OBM allows the user to define upto three bearings on each side/end of the concrete beams. Advanced Bearing Parameters can be defined in the Beam Layout dialog.
    • OBM_Bridge_Bearings_Double.jpg
    • View
    • Hide
    • over 3 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Files
  • How to model sloping parapet walls in RAM Structural System

    Pascual Mauricio
    Pascual Mauricio
    Hello, I have a one-story building with sloping parapets on the exterior walls and flat parapets on an interior portion (see white colored parapets in image below). Currently, my model has the floor and the roof, with the roof having the deck and…
    • over 3 years ago
    • RAM | STAAD | ADINA
    • RAM | STAAD Forum
  • 2019.2 Release Notes - SYNCHRO Pro

    Jacqueline Chen
    Jacqueline Chen
    SYNCHRO Pro SYNCHRO Scheduler SYNCHRO Open Viewer SYNCHRO Plug-ins Update is available here Quick Links & Highlight Video Visit Software Downloads in the Bentley CONNECTION Center. Look for brand SYNCHRO, then click Apply…
    • 3 months ago
    • SYNCHRO Construction Solution
    • SYNCHRO 4D Wiki
  • SYNCHRO 4D Pro

    Arpit Prakash
    Arpit Prakash
    SYNCHRO 4D Pro - 4D Virtual Construction Scheduling and Simulation Technology SYNCHRO 4D Pro is an advanced software tool to plan, schedule, and manage construction projects in a 4D environment. Scheduling and planning is critical to safe, efficient…
    • 20 days ago
    • SYNCHRO Construction Solution
    • SYNCHRO 4D Wiki
  • BEAMS NOT IMPORTED FROM ISM REPOSITORY

    JAIME  NOVOA ROSAS
    JAIME NOVOA ROSAS
    Hello I am importing a structure from Revit to RAM SS. I created an ISM depository from revit. In the previou looks very good, including slabs columns and walls. The problem is when make a new file in RAM SS from a ISM depository the beams are not exported…
    • over 3 years ago
    • RAM | STAAD | ADINA
    • RAM | STAAD Forum
  • SIG Virtual Workshop: OpenBridge - Using a BIM or Standalone Workflow in OpenBridge Designer

    Patsy Gant
    Patsy Gant
    OpenBridge Special Interest Group: Using a BIM or Standalone Workflow in OpenBridge Designer Host: Alex Mabrich, Senior Application Engineer, Bentley Systems, Inc. Date/Time: April 7, 2020 at 2 p.m. EDT Register Now This OpenBridge…
    • over 3 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • "Understanding ISO 19650" Session , 19 March 2020

    Rahul Kumar
    Rahul Kumar
    March 19, 2020 06:30 AM to 09:00 AM Eastern Time (US & Canada)
    Online
    Overview Title: Digital Advancement Academies: Understanding ISO 19650 Date: Thursday, March 19, 2020 Time: 04:00 PM India Standard Time Duration: 2 hours, 30 minutes Register Now Summary ISO 19650 is...
    • over 3 years ago
    • OpenPlant | AutoPLANT
    • Event Details
  • Rebar Modeling in OpenBridge Modeler

    Dilip Matange [Bentley]
    Dilip Matange [Bentley]
    OpenBridge Modeler now offers all of the ProConcrete rebar modeling tools within a new workflow. Please watch this introductory video on rebar modeling in OBM.
    • over 2 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • SIG Virtual Workshop: OpenBuildings Designer - Enlivened BIM Design Alternatives

    Patsy Gant
    Patsy Gant
    OpenBuildings Designer Special Interest Group: Enlivened BIM Design Alternatives Host: Paul Wagner, Content Engineer, Bentley Systems, Inc. Date/Time: 18 February 2020 at 11:00 A.M. EST Register Now Join industry colleagues for February’s…
    • over 3 years ago
    • OpenBuildings | AECOsim | Speedikon
    • OpenBuildings | AECOsim | Speedikon Announcements
  • AECOsim Building Designer

    Johannes Lerch
    Johannes Lerch
    AECOsim Building Designer ist eine interdisziplinäre BIM Softwareanwendung, die Werkzeuge für die Architektur, Baukonstruktion, Lüftungs-, Sanitärplanung und Elektroplanung beinhaltet. Es ist die Weiterentwicklung des Bentley BIM-Angebotes und ersetzt…
    • 6 months ago
    • OpenBuildings | AECOsim | Speedikon
    • OpenBuildings | AECOsim | Speedikon Wiki (Deutsch)
  • Export a PLAXIS model to CAD for post-processing

    Micha van der Sloot
    Micha van der Sloot
    Application PLAXIS 3D Version PLAXIS 3D Date created 18 April 2017 Date modified 18 April 2017 This movie shows how to use the export functionality in PLAXIS to use the exported model in a variety of other applications…
    • over 3 years ago
    • GeoStudio | PLAXIS
    • GeoStudio | PLAXIS Wiki
  • Creating a model with IFC and point cloud import

    Micha van der Sloot
    Micha van der Sloot
    Application PLAXIS 3D Version PLAXIS 3D Date created 25 October 2018 Date modified 25 October 2018 This movie shows how to create a model by using the new point cloud import and IFC import tools, available since…
    • over 3 years ago
    • GeoStudio | PLAXIS
    • GeoStudio | PLAXIS Wiki
  • Reference Transform, Transformatie van reference om DWG of BIM model snel op de juiste plaats te krijgen

    Kees van Prooijen [Bentley]
    Kees van Prooijen [Bentley]
    Met deze VBA kan een reference (bv. DGN, DWG, DXF, IFC etc.) worden getransformeerd naar de juiste locatie in de master file. Met twee punten in de reference en in de master wordt een gelijkvormigheids transformatie uitgevoerd. With this VBA a reference…
    • ReferenceTransform.zip
    • over 3 years ago
    • Bentley.general.nl
    • Bentley.general.nl - Blog
  • SewerGEMs Network to BIM

    Nishadi
    Nishadi
    Hello, I'm looking for the possibility of transferring my sewer network in SewerGEMs to BIM (preferably in REVIT). Any advise how can I do that? Thanks Nishadi
    • Answered
    • over 3 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Forum
  • Collaborative BIM Workflows Help Lower Cost of the Zhengzhou-Xixia Expressway Project

    Elizabeth Alyssa
    Elizabeth Alyssa
    The CNY 10.5 billion Yaoshan-Luanchuan section of the Zhengzhou-Xixia Expressway is 78.8-kilometers long and is a bi-directional and four-lane expressway, which includes 88 bridges, four interchanges, two interoperability hubs, and two super-long tunnels…
    • over 3 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Adding reinforcement bar marks to imodel

    John Pearson
    John Pearson
    I’ve created rebar and assigned bar marks for a 3D pier using ProStructures. After exporting to imodel and opening in Navigator, I don’t have access to rebar data. Can navigator be used to display bar marks and bar spacing? I’d also like to incorporate…
    • over 4 years ago
    • ProjectWise
    • [Archived] Project Review Forum
  • Interview mit Johannes Lerch auf der buildingSMART International Standards Summit in Düsseldorf zum Thema BIM

    Johannes Lerch
    Johannes Lerch
    Vom 25.-28. März 2019 hat der buildingSMART International Standards Summit in Düsseldorf stattgefunden. Bentley Systems hat die Veranstaltung als Silber Sponsor unterstützt. Hier finden Sie das Interview mit Johannes Lerch, Produkt Manager bei Bentley…
    • over 4 years ago
    • OpenBuildings | AECOsim | Speedikon
    • OpenBuildings | AECOsim | Speedikon - Forum (Deutsch)
  • [ORD] Export Subsurface Model to IFC or SHP

    Warren McLachlan
    Warren McLachlan
    Hi all We're busy working on exporting OpenRoads designs to IFC. Half proof-of-concept and half because we need to. Corridors export okay (although definitely not perfect, InfraWorks can't handle the IFCs exported by ORD), but we can't get Subsurface…
    • over 4 years ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • Item Types - Populating Items using Lookup Tables

    Marc Thomas
    Marc Thomas
    Lookup tables are a good way to avoid manual data entry and ensure consistency. Item Types now have a lookup tables capability. Combined with storage of Item Types in shared DGNLIBs and the Pick List feature this is very powerful. The outcome of the…
    • over 4 years ago
    • Peer Blogs
    • Looking under the bonnet...
<>