When importing Hevacomp DDB model to Openbuildings I get following error massages:
1) System.NullReferanceException: Object reference not set to an instance of an object at Bentley.Building.Se.....
2) OpenBuildings Designer has detected a problem…
I've been trying since 6PM GMT to generate an xml for EPC lodgement. Its now 12AM GMT and still nothing.
The latest upgrade is installed.
This needs lodging by 12PM 26/09.
Anybody any pointers?
Product(s):
Hevacomp
Version(s):
V8i
Environment:
N/A
Area:
Design Database
Subarea:
Part L
Problem
Heating System Controls are greyed out on the Part L HVAC Systems tab.
Solution
These…
Hevacomp Energy Assessor (Non-dwelling) Level 5 (Dynamic Simulation)
Allows Hevacomp users - via an accredited Energy Assessor scheme provider - to work towards Energy Assessor status to show competency in production of EPC's using Hevacomp Simulator…
Hevacomp Energy Assessor (Non-dwelling) Level 3 & 4 (SBEM)
Allows Hevacomp users - via an accredited Energy Assessor scheme provider - to work towards Energy Assessor status to show competency in production of EPC's using an approved SBEM interface…
Hevacomp Energy Assessor (Non-dwelling) Level 3 & 4 (SBEM)
Allows Hevacomp users - via an accredited Energy Assessor scheme provider - to work towards Energy Assessor status to show competency in production of EPC's using an approved SBEM interface…
Product(s):
Hevacomp
Version(s):
V8i
Environment:
N/A
Area:
Design Database
Subarea:
Part L
Problem
Part L EPC and Recommendations tabs are greyed out, as below.
Solution
This occurs…
Hevacomp Energy Assessor (Non-dwelling) Level 3 & 4 (SBEM)
Allows Hevacomp users - via an accredited Energy Assessor scheme provider - to work towards Energy Assessor status to show competency in production of EPC's using an approved SBEM interface…
So I am using Bentley Hevacomp to create EPC's and then lodge them on the CIBSE lodgement portal. However, the Hevacomp on my PC is not producing a .xml file so I am having to jump onto my colleague's PC and get the .xml from there. Obviously this is…
Hi have just been modelling a building - Level 5 EPC and I have been adjusting the air permeability and lighting information within Part L design database.
Once I had the building 'passing' within Part L Simulation - I then went back into Part L design…