• 4D Animation for Overlapping activities

    Nayan Datir
    Nayan Datir
    Hello Everyone, I have 2 Overlapping activities. Now I want to assign resources to the task and display the same properly in 4D simulation without changing the task date mentioned in the Baseline schedule. For example: (Please check the attached image…
    • 1 day ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Issue faced while exporting animation with Iray

    Nayan Datir
    Nayan Datir
    Dear Synchro Team, I am facing certain issues while exporting animations from Synchro Pro, I have mentioned them below: When exporting the animation using Iray, the 3D objects appear as Hollow box, the 3D notations do not show, If I am hiding certain…
    • 15 days ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Issue faced while exporting model to Synchro

    Nayan Datir
    Nayan Datir
    Hello Synchro Team, I am trying to create an animation for Piling. While I am creating this animation, I am facing 4 issues which I am describing below: 1. Issue while exporting to Synchro- I have created a Revit Model (Revit 2023) for the Piling. In…
    • 15 days ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Issue with Synchro 6.5.1.5 not installing

    Marc Jaikaran
    Marc Jaikaran
    Please refer to the link provided first to troubleshoot the issue Known issues - SYNCHRO 4D Pro 2022 (v6.5.1.5) release Go to step D for the solution and download either X86/ X64 and install it. If you are not sure of operating systems please speak…
    • 22 days ago
    • SYNCHRO Construction Solution
    • SYNCHRO Control Wiki
  • Is Synchro 4D Pro Version:06.05.01.05 compatible with Revit 2023 or Navisworks 2023 ?

    Marc Jaikaran
    Marc Jaikaran
    The SYNCHRO Pro Plug-ins are dependent on the release by Revit or Navisworks of their APIs which we use in the creation of our plug-ins. This API from Revit / Navisworks was not made available to Bentley until recently. There will be a SYNCHRO Pro Plug…
    • 29 days ago
    • SYNCHRO Construction Solution
    • SYNCHRO 4D Wiki
  • How to export model data e.g. time data and coordinates to xml

    Will Finch
    Will Finch
    I can export the project as an XML however with everything checked on, there is still no data that looks like it references the positions of parts of the model, is there a way to do this while also keeping the time data (install date)?
    • 29 days ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Synchro Control Network Error

    Lauren Miller
    Lauren Miller
    I have uploaded an iModel to Synchro Control and when I try to view it, I am getting a network error and Synchro Control says there is no iModel uploaded. However, when I try to upload again, it makes me delete the old Model first, so there is obviously…
    • 1 month ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Synchro 4D Pro crashing wont open

    Muhammad Ahadi Fathur Rahman
    Muhammad Ahadi Fathur Rahman
    hi! I had trouble opening Synchro 4D Pro software version 6.5.1.5. It was working normally, and after the update of Connection Client, it can’t open. now, it is always crashing, and can't open at all. I had tried to uninstall and reinstall…
    • 1 month ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Does Synchro have a plugin for Navisworks manage 2023? if yes, how to install it? I am trying to install existing plugin .exe but it doesn't work.

    Ameya Talekar
    Ameya Talekar
    NA
    • 1 month ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Synchro 4D Pro export to .fbx with animation failing

    Rachel Herron
    Rachel Herron
    I have tried to export to .fbx with the animation from synchro but once I click export afing setting my export setting it pops up this error 'export is finished by failure'. Does anyone know how to resolve this as I want to export to .fbx with the animation…
    • 1 month ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Synchro Control Issue

    VDC Coordinator 4
    VDC Coordinator 4
    Hello everyone. Today I want to describe our work with that service. Our typical team(synchro users) on one project is: -VDC coordinator which use Synchro 4D Pro and working mostly with resources and their assigning (human, material and cost). -PM which…
    • 1 month ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Script to delete 3D objects.

    Jerry David Jaypaul
    Jerry David Jaypaul
    I would like to know if there are any scripts to delete 3D objects based on the level or properties modelled using openbuilding designer or openplant modeler. This will help to clean the model of unwanted elements on projects having .sp model size more…
    • 1 month ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Synchro 4D Pro : 3D shade / edge thinner and was half transparent

    Hay Mar Win
    Hay Mar Win
    • 1 month ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Resourses from Task List

    Aniket Chougule
    Aniket Chougule
    Hi, I have a question regarding Resourses. Can we create resourses from task list because I am using Synchro Scheduler. In Synchro 4D Pro we can create resourses from 3d model. Same tree formmat we can create in resourses tab when we use synchro Pro…
    • Answered
    • 1 month ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Export .spx file from Revit 2023?

    Lauren Miller
    Lauren Miller
    When I install the Revit add-in for Synchro exports, Revit 2023 is not an option. How else can I export 3D models from Revit to import into Synchro?
    • 1 month ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • SYNCHRO Clashes

    Satoshi.M
    Satoshi.M
    Hi, The customer installed the SYNCHRO 4D Pro. However, the SYNCHRO clashes when opening. Though they tried the following link, the issue has not been improved. Synchro crashes before opening Could you please tell us the way to improve it? …
    • 1 month ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Script | Fill Resource “User Field”-Value

    Mariel Rivero Dapena
    Mariel Rivero Dapena
    Dear Bentley Synchro Forum Team, It is possible through a script to fill resource-"user fields” values with information from the associated activity/task? Thank you in advance for reading and for the response you can provide me with. Best…
    • Answered
    • 2 months ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Script | Fill Resource "User Field"-Value

    Mariel Rivero Dapena
    Mariel Rivero Dapena
    Dear Bentley Communities Team, It is possible through a script to fill resource-"user fields” values with information from the associated activity/task? Thank you in advance for reading and for the response you can provide me with. Best regards…
    • 2 months ago
    • About Bentley Communities
    • Communities Feedback Forum
  • XML | Microsoft Project export and User Fields

    Mariel Rivero Dapena
    Mariel Rivero Dapena
    Dear Bentley Communities Team, When I try to export the XML from Synchro I get a warning indicating that the allowed number of “user fields” has been exceeded. The message shows that 50 user fields were exported. Is this the limit for exporting user…
    • 2 months ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Regarding the unit on Rules

    Satoshi.M
    Satoshi.M
    Hi, On Rules , is it possible to change from Unit / Hours to Unit / Day ? Probably, I think that it is IMPOSSIBLE. However, please let me double-check this. Best Regards Satoshi Matsuura
    • 2 months ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • 3D view limitations? - Synchro 4D Pro

    Planning Groningen
    Planning Groningen
    Hi all, For my current projects (last 2 and since the renewal of our Synchro 4D pro license) I'm experiencing that certain surfaces are invisible from above but not from below. Also certain faces of random objects (mostly masses from Revit) For each project…
    • 3 months ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Copying Directly Assigned 3D Resources from one Task to a second Task

    Jim Judd
    Jim Judd
    I have a schedule imported from MS Project which is due to be replaced soon by one created and imported from P6. I'd like to be able to select two Tasks (one from the MS project schedule, and the second from the P6 schedule) and have the Directly assigned…
    • 3 months ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Script to assign Resource task parent

    Wagner Pereira Pinto
    Wagner Pereira Pinto
    Hello guys! Is it possible to associate the parent of the task of the associated resource in a user field? Thanks RESOURCE(SELECTED) ASSIGN_UF(OVERWRITE,"TS8-ACTIVITY_ID",STRING, RESOURCE.TASK.PARENT )
    • 3 months ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • Beginner | workplaces for various contractors

    Luis Van Nieuwenhuyse
    Luis Van Nieuwenhuyse
    Hello everyone, I am completely new here and was introduced to Synchro Pro this week. I was assigned to work on a project and I would have liked to listen to experienced people on how best to proceed. I have a project, 12 different workplaces on that…
    • 3 months ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
  • SYNCHRO 4D pro and Windows 11

    Sergi Ferrater
    Sergi Ferrater
    Hello, is there any forecast for the release of SYNCHRO 4D Pro for Windows 11? I have many students who cannot take the course because they do not have a computer with Win10. Is there any workaround to use SYNCHO on Win11? Thank you
    • 3 months ago
    • SYNCHRO Construction Solution
    • SYNCHRO Forum
>