• How do each of the LoadBuilder methods work?

    Jesse Dringoli
    Jesse Dringoli
    Applies To Product(s): WaterGEMS, WaterCAD, SewerGEMS, SewerCAD, HAMMER Version(s): CONNECT Edition, V8i Area: Modeling Authors: Jesse Dringoli, Dan Iannicelli, Bentley Technical Support How do each…
    • over 1 year ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • LoadBuilder Error: "# Id(s) do not match any id of the model..."

    Scott Kampa
    Scott Kampa
    Product(s): WaterGEMS, WaterCAD, SewerGEMS, SewerCAD Version(s): 08.11.XX.XX and 10.00.00.XX Area: Modeling Problem When running LoadBuilder the following errors appear. "# ID(s) do not match any IDs in the model." "Calculations…
    • over 6 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • Using LoadBuilder to assign Customer Meters to the nearest pipe using taps and laterals

    Larry Abla
    Larry Abla
    Product(s): WaterGEMS, WaterCAD Version(s): CONNECT Edition Area: Modeling Introduction In earlier versions of WaterGEMS and WaterCAD, LoadBuilder could be used to assign Customer Meter elements to the nearest junction…
    • 3 months ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • Assigning demand patterns after a Loadbuilder run

    Jesse Dringoli
    Jesse Dringoli
    Product(s): Bentley WaterCAD, WaterGEMS Version(s): 08.11.XX.XX Area: Layout and Data Input Problem If demand patterns are created after importing demands from Loadbuilder, is there a way to assign the demand patterns…
    • over 7 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • "Calculations failed due to one of the following reasons..." when trying to use Loadbuilder in ArcMap

    Jesse Dringoli
    Jesse Dringoli
    Applies To Product(s): Bentley WaterGEMS, Bentley SewerGEMS, Bentley HAMMER Version(s): 08.11.XX.XX Environment: N/A Area: Original Author: Mark Pachlhofer, Bentley Technical Support…
    • over 7 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • How do you consider only a selection set of elements with LoadBuilder?

    MPachlhofer
    MPachlhofer
    Applies To Product(s): Bentley WaterGEMS, Bentley WaterCAD, Bentley SewerGEMS, Bentley CivilStorm, Bentley SewerCAD Version(s): 08.11.xx.xx Area: Modeling Original Author: Jesse Dringoli, Bentley Technical…
    • over 6 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • LoadBuilder applying demands or loads to inactive elements

    Larry Abla
    Larry Abla
    Product(s): WaterGEMS, WaterCAD, SewerGEMS, SewerCAD Version(s): CONNECT Edition, V8i Area: Modeling Problem When applying demands or loading data to a model using LoadBuilder, it appears like demands are being…
    • 11 months ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • Re: How to prepare shape file for Land use Breakup..

    Mal Sharkey
    Mal Sharkey
    I don't have a land use shapefile handy, but it is just a standard polygon shapefile. You can do a Google search to find some examples (e.g. here is a site that has free land use shapefiles for the USA: www.webgis.com/lulc_shputm.html ). The only trick…
    • over 13 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Forum
  • Re: How to model the entrance of DMA with PRV

    Jesse Dringoli
    Jesse Dringoli
    Hello Aburawe, In the PRV properties, choose pressure as the Setting Type and enter the downstream pressure as the pressure setting. Make sure to enter the correct elevation. You can use a reservoir immediately upstream and the PRV will bring the HGL…
    • over 10 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Forum
  • Re: WaterGems database stored in Oracle

    Jesse Dringoli
    Jesse Dringoli
    Hello Jun, WaterGEMS uses an Access database to store model information. The complex structure of the schema is something that was meant to be altered by an end-user, and it cannot be changed to be stored in a different database. Instead, you should…
    • over 11 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Forum
  • Re: New WaterGEMS User – tips and tricks

    Mal Sharkey
    Mal Sharkey
    shadi khouri: About mergeing the pipes: im asking while editing and laying out the pipes, is it possible to merge tow pipes without deleting both of it including the junction that connect it? ( it's possible in ARCGIS - is it possible in waterGEMS…
    • over 13 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Forum
  • Re: Water demands

    Jesse Dringoli
    Jesse Dringoli
    Hello Brian, Have you looked into using Loadbuilder? (under the Tools menu) If your parcels are in shapefile form, you can allocate demands using one of many different methods that Loadbuilder offers. Note that the end-result demands will…
    • over 14 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Forum
  • Re: Water demands

    Kim Davis
    Kim Davis
    Brian: Jesse's right. LoadBuilder is probably your best bet here. You can export from Bentley Map using File>Export>GIS Types to convert your dgn features into shapefiles that LoadBuilder can read. You can either export the parcel polygons themselves…
    • over 14 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Forum
<