Hello,
I want to insert an embankment into my pond in ORD 2021 release 1. The enbankment should be on the elevation 27.90 and the bottom level is on the elevation 27. I already created a solid element that presents the embankment (pink one):
…
Riser Top Elevation – This is the elevation at the top of the riser.
Minimum Z – This is the elevation at the top of the riser.
Maximum Z – This is the elevation at the top of the riser.
Size Pond – Checking this option allows SITEOPS to calculate…