• Feature requests

    Colin Ricks
    Colin Ricks
    Background: I am a consultant specializing in water distribution modeling and have been using both WaterGEMS and InfoWater regularly for 9 years. I am therefore, very familiar with the strengths and weaknesses of both platforms. All of these requests…
    • over 2 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Forum
  • Customer meter results (N/A)

    Attila Bibok
    Attila Bibok
    Hi! I used customer meter objects to represent different pressure demands in their close proximity. I used user data extensions to store pressure demand (different homes have different height). It seems straightforward, but i've got no hydraulic…
    • Answered
    • over 5 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Forum
  • Why does the calculated system head curve contain negative head values for low flow situations?

    Scott Kampa
    Scott Kampa
    Applies To Product(s): SewerCAD, WaterCAD, WaterGEMS Version(s): 10.00.xx.xx, 08.11.xx.xx Area: Modeling Original Author: Scott Kampa, Bentley Technical Support Group Problem The calculated system head curve…
    • over 6 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • Why are my version 7 results different from V8i or CONNECT edition results?

    MPachlhofer
    MPachlhofer
    Product(s): WaterGEMS, WaterCAD, HAMMER Version(s): 08.11.XX.XX, 10.00.XX.XX Area: Output and Reporting Problem Why are my version 7 results different from V8i or CONNECT edition results? Solution Version 7 of WaterGEMS…
    • over 6 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • How can I display Post Calculation Processor results for different scenarios?

    Scott Kampa
    Scott Kampa
    Product(s): WaterGEMS, WaterCAD Version(s): 10.00.xx.xx, 08.11.xx.xx Area: Modeling Problem How can I display Post Calculation Processor results for different scenarios? Solution The Post Calculation Processor is a tool…
    • over 6 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • After computing the model, the pump efficiency results are listed as N/A

    Jesse Dringoli
    Jesse Dringoli
    Applies To Product(s): WaterGEMS, WaterCAD Version(s): CONNECT Edition, V8i Area: Output and Reporting Problem After computing the model, the pump efficiency results listed as N/A in the pump properties or the pump…
    • over 2 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • Graphing flow coming out of a tank

    Yashodhan Joshi
    Yashodhan Joshi
    Product(s): WaterGEMS, WaterCAD Version(s): 10.XX.XX.XX, 08.11.XX.XX Area: Output and reporting Problem How do I see a graph of actual flow coming in and out of a tank? Solution The inflow and outflow results for a…
    • over 3 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • How does WaterGEMS and WaterCAD calculate the water age in a looped system?

    Scott Kampa
    Scott Kampa
    Product(s): WaterGEMS, WaterCAD Version(s): 10.00.xx.xx, 08.11.xx.xx Area: Modeling Problem How does WaterGEMS and WaterCAD calculate the water age in a looped system? For instance, a case where flow from two pipes in converging…
    • over 6 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • Export data to an Excel spreadsheet

    Scott Kampa
    Scott Kampa
    Product(s): WaterGEMS, HAMMER, WaterCAD, SewerGEMS, SewerCAD, StormCAD, CivilStorm Version(s): 08.11.05.58 and later Area: Output and Reporting Problem Can I easily export my results to an Excel spreadsheet? Can I export…
    • 7 months ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki
  • Using the Post Calculation Processor for statistical analysis of results

    Sushma Choure
    Sushma Choure
    Product(s): Bentley WaterGEMS, WaterCAD Version(s): CONNECT Edition, V8i Area: Output and Reporting Overview The purpose of this TechNote is to review the features and use of the Post Calculation Processor available in WaterGEMS…
    • over 1 year ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki