• Sequencing definition with fixed tunnel face

    Micha van der Sloot
    Micha van der Sloot
    Application PLAXIS 3D Version PLAXIS 3D Date created 18 April 2017 Date modified 18 April 2017 This movie shows the difference for the tunnel excavation in staged construction when using the default continuous propagation…
    • over 3 years ago
    • GeoStudio | PLAXIS
    • GeoStudio | PLAXIS Wiki
  • Tunnel advancement script for PLAXIS 3D

    Stefanos Papavasileiou
    Stefanos Papavasileiou
    Application PLAXIS 3D Version PLAXIS 3D Date created 13 December 2016 Date modified 13 December 2016 With the introduction of the tunnel designer with sequencing options, it is now possible to define a repetitive…
    • over 1 year ago
    • GeoStudio | PLAXIS
    • GeoStudio | PLAXIS Wiki