• RE: Channel catchment assignment

    MPachlhofer
    MPachlhofer
    Keyan, A channel can be provided different elevations or slope along the length through the use of transitions and/or cross sections . The linked to wiki article also explains the difference between the two elements and when it's best to use one over…
    • over 6 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Forum
  • Cross section vs Transition for modeling slope or size change

    Jesse Dringoli
    Jesse Dringoli
    Applies To Product(s): SewerGEMS, StormCAD, Civilstorm Version(s): CONNECT Edition, V8i Area: Modeling Original Author: Jesse Dringoli, Bentley Technical Support Group Problem What should I…
    • over 2 years ago
    • OpenFlows | Water Infrastructure
    • OpenFlows | Water Infrastructure Wiki