• Bentley HAMMER: When using "Pump Shut-off after time delay" option Pump head is beyond shut-off head due to increased pump speed
    Georgio Rizk
    Hi, I have a transient hydraulic model developed in Bentley Hammer Connect 4 version 10.04.00.106. The scenario consists of closing the valve downstream a running pump after 190s and then turning...
  • Using Controls, Conditions, Actions and Control Sets in WaterGEMS and WaterCAD
    Jesse Dringoli
    Product(s): WaterGEMS, WaterCAD, SewerCAD Version(s): CONNECT Edition, V8i (SELECTseries 6) Area: Modeling List of Topics Overview New controls editor Vs Classic controls...
  • Flow Control Valve
    Matthew Peterson
    Does anyone have an example of a flow control valve I can look at? I have a centrifugal pump in my system thus I added a FCV in my model to try and hold the pump on its curve during transient analysis...
  • Modeling Low Impact Development (LID) Controls
    Scott Kampa
    Applies To Product(s): CivilStorm, SewerCAD, SewerGEMS Version(s): CONNECT Edition, V8i Area: Modeling Original Author: Terry Foster, Bentley Technical...
  • Customer Meter Impact on Run Times
    Nathaniel Homan
    Hello, I have two versions of a model, one in which I have allocated demands directly to junctions, and another where the service locations were imported as customer meters and then associated with pipes...