SHEIKH ZAYED BRIDGE
Location: Abu Dhabi, U.A.E.
Description: A twin deck bridge comprising prestressed concrete box girders supported by bearings on concrete piers and by hangers on a pair of 3D steel arches. The steel arches are connected to the…
OpenBridge Designer CONNECT Edition V10.09.01.15 contains the following analytical enhancements, user request enhancements, and bug fixes in its components (RM/LBC/LBS):
AASHTO LRFD 9th Edition update (LBC)
This enhancement aims to support the…
RM Bridge CONNECT Edition V11 Update 9 (V11.09.00.XXX) contains the following enhancements and error corrections:
BIM Workflow: Revised Model Transfer from OpenBridge Modeler (OBM)
BIM Workflow: Import and Update Build Order for Segmental Bridges…
We are pleased to announce the release of RM Bridge CONNECT Edition V11 Update 8 (V11.08.00.29), which is now available on Bentley’s Software Fulfillment Center. This release includes the following features to enhance BIM workflow, user experience, and…
We are pleased to announce the consolidation of Bentley’s bridge software, forming new OpenBridge Designer CONNECT Edition. The application consolidates the modeling capabilities of OpenBridge Modeler and the analysis and design features of LEAP Bridge…
RM Bridge CONNECT Edition V11 Update 7 (V11.07.00.12) includes the following enhancements and error corrections:
Reinforcement Design -Phase I
New Takeda Hysteretic Spring Element
New Action (SupCoex) for Reporting Concomitant Envelope Results…
RM Bridge Concrete CONNECT Edition V11 Update 6 includes important features to enhance BIM workflow, user experience, and product performance:
BIM Workflow: Transfer Cross-frames from OpenBridge Modeler (OBM) to RM
FEM Enhancements: Composite Forces…
RM Bridge CONNECT Edition V11 Update 5 contains the following enhancements and error corrections:
FEM Enhancements for Composite Cross-sections
New Graphical Engine in RM Analyzer
New Cable-stayed Wizard
Analysis Performance Improvements for…
RM Bridge CONNECT Edition V11 Update 4 contains the following enhancements and error corrections:
Enhanced Interoperability with OpenBridge Modeler (OBM)
FEM enhancements for Composite Cross-sections (Phase I)
New Graphical Engine in RM Modeler…
RM Bridge View represents the new post-processing tool of RM Bridge.
With the latest version many new features were added, which allows to view:
Internal forces
Stresses
Strains
Design check results
Live loads
Structure
…
RM Bridge View is a new post-processing structure and results viewer module based on the MicroStation V8i Power Platform.
It is an optional Add-On for the RM Bridge Advanced product. Please install it only, if you want to use the RM Bridge Advanced…
The Australian Super T-Beam Wizard has been added. It was derived from the subtype Pre-Cast Wizard. Geometry definition has been extended with pre-stressing templates and loading according AS 5100.2 - 2004.
Several important extensions and improvements…
The maintenance version of RM Bridge Advanced+ V8i v08.11.28.02 was published.
The new product line RM Bridge V8i v08.11 replaces the RM Bridge Professional v08.10 product line and requires the new SELECT Licensing . You need at least the new SELECT…
At the Bridge & Bridge Inspection LEARNing Conference , Raul introduces users to his favorite new solution – the soon to be released PowerBridge Modeler software. Hear why Raul is so excited and learn what other sessions he is teaching. #Bentley15 .
Are you coming to the 2015 Bridge & Bridge Inspection LEARNing Conference in Indianapolis? Senior Engineering Consultant, Alex Mabrich, will be there. See what Alex is teaching in this short video.
Want to find out who else is teaching? Visit the…
This year's LEARNing Conference for Bridge and Bridge Inspection features best practices, tips & tricks, and hands-on workshops for some of Bentley's most popular bridge design & engineering products including LEAP Bridge Steel, RM Bridge, ProStructures…
The new maintenance release RM Bridge Advanced+ V8i v08.11.11.02 was published.
The new product line RM Bridge V8i v08.11 replaces the RM Bridge Professional v08.10 product line and requires new SELECT Licensing . You need at least the new SELECT license…
In case you've missed it, here is a link to an excellent presentation by Finley Engineering Group, Inc. (FINLEY).
http://www.roadsbridges.com/bridge-information-modeling-design-and-engineering-collaboration
Webinar Overview:
Bentley provides…
New product line RM Bridge Advanced+ V8i v08.11.11.01
Index
1. About the RM Bridge V8i v08.11 products
1.1 RM Bridge V8i
1.2 RM Bridge Advanced V8i
1.3 RM Bridge Cast V8i
1. About the RM Bridge V8i v08.11 products
The new RM…
RM Bridge V8i (SELECTseries 3) v08.10.07.02 is a maintenance release for v08.10.07.01 We recommend using it as your new production release. It fixes reported common problems of the main release:
ULTCHK: Reinforcement defined at composite was not…