• staged contruction of embankment

    Shubhadip Sen
    Shubhadip Sen
    The problem is concerned with staged construction of embankment. While trying to plot excess PWP vs time, the results are not matching the expected outcome. Is it because of the alternate plastic/consolidation calculation type? If so, how can I produce…
    • 4 months ago
    • GeoStudio | PLAXIS
    • GeoStudio | PLAXIS Forum
  • Error code 101- Back analysis

    Ifa Chusna
    Ifa Chusna
    in computing back analysis of failure case, the validation in this model was SF less than 1. when I decreased the GSI (because the method material was Hoek-Brown), it resulted in the error code 101 in plastic computation. How could I validate the site…
    • over 1 year ago
    • GeoStudio | PLAXIS
    • GeoStudio | PLAXIS Forum
  • Getting pore water pressure in drained clay Plastic calculation.

    Piyush Mohanty
    Piyush Mohanty
    As can be seen in the drawing, there is drained clay sandwiched between drained sand layers. When I am doing the plastic calculation, I am getting 0 excess pore water pressure in sand, but not in the drained clay layer soil. What can be the reason for…
    • over 2 years ago
    • GeoStudio | PLAXIS
    • GeoStudio | PLAXIS Forum
  • View related content throughout GeoStudio | PLAXIS
  • More
  • Cancel