• Preparing reinforcement drawing in ProConcrete - European standards

    Wiktor Mertka
    Wiktor Mertka
    Hi, I am in the process of testing Bentley software when performing reinforcement of solids prepared in OBM. Since the drawings I will prepare are to be sent for construction in Poland, I have to stick to our standards. The main problem I encountered…
    • 7 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • How to save reinforcement design? LEAP Concrete Substructure

    Dylan Kennedy
    Dylan Kennedy
    Hello, I am working in OpenBridge (10.9.1.15) StandAlone LEAP Concrete. I have a question about how to save reinforcement design in LEAP Concrete. When I am working in Substructure, I generate loads, run analysis and then design the reinforcement…
    • Answered
    • 9 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Workflow from road alignment to the reinforced concrete documentation and the concrete formwork documentation?

    Victor Saito
    Victor Saito
    Hi guys, I have a big doubt about the workflow about the Bentley produtcs. I need to make a project of a bridge, but I need an especific road alignment for it. And on the end the I need reinforced concrete documentation and the concrete formwork documentation…
    • over 4 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • View related content throughout LARS | LEAP | OpenBridge | OpenTunnel | RM
  • More
  • Cancel