I need to duplicate some pipelines and junctions in my model. The water leads connecting the waterlines to adjacent lots are only represented by one line when there should be two. Trying to input the correct demand (gpm) without just doubling the demand…
I am working on a model in which many of the junctions are not on the existing pipeline. So, I want to attach the existing junction(which is not attached to the pipeline) to the existing pipeline by not creating a new junction on the pipeline and splitting…
Hi,
I am a doing modelling for improvement of the existing system. Many location velocities are high and pressure is low. Even I tried to increase the pump capacity the pressure is not increased.
Please check the model in the below following link…
Hi,
I have another issue in the model, If you check the T-1 inlet it was connected as a top inlet. When I run the simulation for avg daily demand I don't have any issue. However, when I run the same model with Max daily demand scenario (Peak factor…
My model is fine and everything works fine however the design criteria for demand is 2.1 multiply by the average demand + Fire Flow (as indicated in the snapshot)
I have setup the Scenarios and alternative for this criteria based on the BASED DEMAND…