• How To Create A Custom Cable Type

    Lindon Phillips
    Lindon Phillips
    I can't Find anything explaining how to create a custom cable type. From the " How to move customised Cable Files to a new version " I under stand the first window but the bottom half of this second window I don't really under stand what the initial…
    • over 1 year ago
    • Hevacomp
    • Hevacomp Forum
  • Strike risk assessments shows installing LPS to have little effect on risk and a very heavy weighting on soil resistivity values.

    Mark Stone
    Mark Stone
    Hi there, Myself and some more senior engineers are failing to understand the output of the risk assessments we're doing using the Strike software. There seems to be very little weighting on attempts to reduce risk by using wiring precautions and…
    • over 4 years ago
    • Hevacomp
    • Hevacomp Forum
  • Large loss of PSCC across first leg of circuit from Transformer to Main switchboard

    Andy Leask
    Andy Leask
    Afternoon all I hope someone can shed some light on what i think is a problem with hevacomp connect, i am currently working on a large project and at the transformer, we have a fault current of 24kA but 10m upstream we have a fault current of 7.9kA…
    • Answered
    • over 5 years ago
    • Hevacomp
    • Hevacomp Forum
  • Electrical Design, Strike programme, risk assessment always deems a system to be necessary and always indicates that no solution is available.

    Stuart Martin
    Stuart Martin
    Electrical Design, Strike programme, measures to protect against lightning. I have attempted to carry out a risk assessment and develop mitigation measures using this programme. However it seems that no matter which values I change the calculated risk…