• Hello Everyone, Please is there a difference between Bently inroads and Bently Open roads? Thanks in Advance

    Mo Tumba
    Mo Tumba
    So yesterday I got a senior executive asking me to go and learn a new software for some new client needs. He said he wanted me to learn Open roads. I know In Roads is a software from Bently but not woo sure if its same software as open roads? Please does…
    • 4 months ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • What is the difference between an Error and a Warning in Civil Message Center?

    David Vazquez
    David Vazquez
    When applying DOT design standards, warnings and errors both tell the user that DOT design standards has been violated. I do not understand the need to differentiate them. Can someone please explain the difference between an Error and a Warning in ORD…
    • Answered
    • 5 months ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • How do I add a new Feature definition/ Cell Library for UK standards for a new Chamber in ORD

    Rupali Jadhav
    Rupali Jadhav
    I am using Uk standards Library for designing Stormwater drains. How do I add a new Feature definition/ Cell Library which is not in the Cell Library for a new Chamber (image attached for reference) in ORD. I tried using the Add New Template option and…
    • 7 months ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • Design Cross Slope report values is not matching.

    lalit chandra
    lalit chandra
    I am trying to generate cross slope report @ 10 m interval by station base or station offset report but i am not getting appropriate values of cross slope in report. It seems correctly in cross-section view. Am missing something ?? Images is ready for…
    • over 1 year ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • What viewer(s) are available for Open Roads and Open Site?

    Mark Linville
    Mark Linville
    The organization is one year (three months attempting to transition to ORD from Power Survey SS2, four months using ORD for production and using PennDOT WorkSpace/WorkSet) into using Open Roads (We have Open Site, but it has not been used as of this writing…
    • over 1 year ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • How to insert or modify the terrain points?

    soumyaranjan samartha
    soumyaranjan samartha
    Dear community, Could you please tell me that, how I can be able to insert a new point or modify the exiting point in a terrain model? Actually I would like to know that how it will be possible in CSV file and as well as in exiting terrain ( given by…
    • over 2 years ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • facing some challenges while using Open Road designer

    soumyaranjan samartha
    soumyaranjan samartha
    Mentioning the challenges here with: 1. How to change certain locations/ alignment at ground level by taking reference of x,y, or chainage? 2. How to change the centerline? 3. How to maintain or design an exact certain level /ground level…
    • over 2 years ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • View related content throughout OpenRoads | OpenSite
  • More
  • Cancel