• Drainage How: Calcs based on Construction Length Slope?

    Jeff Martin
    Jeff Martin
    Here's my need: to be able to have the calcs be consistent with callouts (client wants Construction Length and Construction Slope called out on the plans and the calcs to be consistent with them). My understanding is that the calcs are based on Unified…
    • over 1 year ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • View related content throughout OpenRoads | OpenSite
  • More
  • Cancel