    Current Version: Power GEOPAK V8i (SS10) I am in the process of starting a new drainage design and am trying to determine the most efficient workflow in order to provide the following: - 2D Drainage Layout - Inlet and Pipe Computations - Drainage…
    • 4 months ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • Re: GPK Drainage - Show water and sewer crossings in profile?

    Josh M
    Josh M
    Dan, Everything checks out. My sewer and water lines are drawn using different library items, each with unique symbology and attributes (double checked). I even deleted and recreated the offending water lines. They are visible as a file referenced…
    • over 14 years ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • Re: InRoads Suite V8i- Drainage Preferences files

    Jason W. Smithey [Bentley Civil]
    Jason W. Smithey [Bentley Civil]
    The default versions of these files are located in the imperial and metric folders under the data folder of the product installation which is, by default, C:\Program Files\Bentley\InRoads Group V8.11\. In the imperial folder, the structures.dat and hydro…
    • over 13 years ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • Re: InRoads - Storm Water

    Jason W. Smithey [Bentley Civil]
    Jason W. Smithey [Bentley Civil]
    Brian, You may already be aware but StormCAD V8i has options to import and export InRoads Storm & Sanitary data. Please see the following posting for more information: http://communities.bentley.com/Products/Hydraulics___Hydrology/f/5925…
    • over 14 years ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • GEOPAK Drainage - Design taking a long time at 80%

    Josh M
    Josh M
    When I do a GEOPAK Drainage "Network Design", the progress bar quickly jumps to 80% and seems to hang there for quite some time. For the particular network that I am working on it takes 3.5 minutes to finish after getting to 80%. It feels much longer…
    • over 14 years ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • Elevation-Volume (Stage-Storage) Data from GEOPAK SS3

    Matt Schlicker
    Matt Schlicker
    Experts! I'm trying to get incremental volume information out of a pond terrain that I've created in GEOPAK SS3 to develop a Stage-Storage table for pond routing in PondPack. I've reviewed the analysis tools and can't seem to find any way to do this…
    • over 10 years ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • Civil 3D Pipe Network Conversion

    gudinnenfreyja
    gudinnenfreyja
    My company is trying to develop a way to utilize the intelligent Civil 3D Pipe Networks, but we are required by most of our clients to display all of our data in a 3D model in Microstation. I am trying to create a workflow to convert Civil 3D 2012 Pipe…
    • over 10 years ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • Inroads S&S(V8i) export to Microdrainage

    Ash Thompson
    Ash Thompson
    I have created a normal drainage alignment in S&S in a SDB file (inlets. pipes and areas). I now want to export this to MicroDrainage. I have gone to the File - Export - Micro Drainge The standard.pip file and conduit.sec file is selected from the…
    • Answered
    • over 9 years ago
    • OpenRoads | OpenSite
    • OpenRoads | OpenSite Forum
  • Re: GPK Drainage - Show water and sewer crossings in profile?

    Josh M
    Josh M
    Dan, I think we might be getting somewhere. When I open a water profile, GEOPAK thinks for a short while (presumably generating elevations along the plan view element), but then all the options in the profile box revert back to some sort of default…