Hi there, I am trying to display a bore log with two surface casings:
-1 larger diameter surface casing is cemented to 6m
-1 smaller diameter surface casing is cemented to 53m
I would like to be able to visualise the cement in the gaps which are…
I am creating 250' boring logs and the lithological data that is plotted under the 'Material Description' column it's extremely crowded and confusing to differentiate which lithology correlates with which depth. That being said, is there a way I can break…
Can someone please help me troubleshoot why my companies address is not showing up in the final log despite it being entered into the template? Only the zip code is appearing in the preview and final pdf once saved.
Here are a couple of screenshots…
After editing the standard gINT Logs environmental borehole template to match my companies format, I am having 3 problems editing the 'Page 1 Header Block' for Groundwater Levels:
1. When editing the 'After Drilling' block, I've tried changing the…
This is a very simple problem I am trying to solve, but I cannot find the simple anywhere.
On my output gint logs some of the the header (client and project name information) overlap the log titles (depth and graphic logs), on all the pages after the…
I have several logs that the overburden material were not logged, and the descriptions begin at the top of bedrock. On our current report template this results in a lot of blank log space (multiple pages given the depth log page required to accommodate…
In some of my libraries, the cursor is not visiable on the work area of the Report Design Tab (I can only see it in the toolbar areas). I've tried the instructions below and it didn't work. Any solutions?
Cursor Disappears in Report Design and Preview…
HI, I'm new to gINT and just downloaded an agency report of Pennsylvania DOT from http://communities.bentley.com/products/geotechnical1/w/wiki/agency-reports.aspx.
So in the column of USCS/AASHTO, as you can see in the attachment or from the sample…
I have some difficult to show soil description for each sample in Sample Table from Lithology Table. Here are what I did:
<<Sql(SELECT (LITHOLOGY.DESCRIPTION) _ FROM LITHOLOGY _ WHERE (<<Sample.Depth>> < <<Lithology.Bottom>>) AND _ (<<Sample.depth…
Good morning,
I am trying to plot shear wave values in both a Log Report and Graphic Report format. If you've seen these plots before, it's customary to plot point values at depth and connect them with incremental "stepped" lines. This can be accomplished…
I have gINT Professional v08.30.03.135
I am attempting to clean-up the look of our logs and I can't figure out how to make the depth column join nicely with the lithology column for small layers of stratigraphy (see print screen attached).
I only…
Hi Ryan,
What you are doing is correct.
I have had to do this many times for Log reports, if I wasn't able to come up with a min/max combination that would handle enough of the data I would create one or two other min/max combinations and then rely…
I have been attempting to make smart logs for my test holes logs. I have followed both the instructions from the gINT design course as well as the instructions in the help menu and I can't get either of the examples to work.
What am I missing?
I am using gINT V8i S s1 version 08.30.03.140. on MS windows 2007.
I have a question regarding changing the reporting of N-values on boring log reports. The project manager wants to show an N-value for the sum of both the 2nd and 3rd intervals and…
Dear collegues:
I am a new gINT user and I am experiencing some troubles when report generating. I am currently using one of the logs report included with gINT (in its spanish version) and everything seems to work correctly but when I try to include…
I like the fact that I can now export logs from gint into microstation as a dgn file. I have always thought that the gint editor was very cumbersome. I'd like to make some suggestions for some future features/options.
When I export the logs, they…
Has anyone managed to use the Foreign PointID Expression for more than one associated exploratory hole.
I've set up a field in a table with the point list I want to plot, seperated by commas. For example, BH01a has "BH01b, BH01c, BH01d" in that field…
Not saying this is the "best" way but consider the following approach.
The way I understand your Problem 1 is that you like the graphic output of a typical well installation set up in a log report. However, if you have a very long riser and want the…
If I want to view logs and/or print them, I have to open them page by page in the graphical data input view. I can't view any logs properly using output.
If the job is small, this isn't a problem. However I just finished a job with 6 - 50 foot logs…
The general rule for rounding '5' my company uses is to round to the closest even number.
ie 99.5 = 100 or 98.5 = 98
2.405 = 2.40 or 1.395 = 1.40
It appears that gINT always rounds '5' up.
The only formulas I have been able to find even…
The way I handle this is as follows. Note that this is just one way and there are other approaches that might work better for you.
My well table includes only 4 fields, depth, bottom depth, well graphic, and well notes (not a standard ags or gINT table…
This is a copy of a post from the old gINT forum so some of the information may be a bit dated but most should still be applicable. It is relevant to some of the current discussions in the forum.
Just wanted to relate some of my experiences in setting…