Hi all ,
i modled two perpendicular tunnels (tunnel and gallury) , one is excavated by TBM and the other by NATM,
the probléme is that in the staged contruction part the calculations stop from the first phase, i dont see where the probléme is ,
…
Title: SIG Virtual Workshop: Geotechnical Analysis – Optimizing Undrained Parameters for Undrained Soft Soils Date/Time: July 14, 2020 10:00 A.M. CEST 04:00 P.M. CEST Presenter: Micha van der Sloot, Senior Manager, User Success, Geotechnical, Bentley…
Title: SIG Workshop: Geotechnical Analysis – Working With 3D Deep Excavation in PLAXIS, Part 2 Presenter: Micha van der Sloot, Manager Technical Support, Geotechnical, Bentley Systems, Inc. Date/Time: June 9, 2020 10:00 A.M. and 4:00 P.M. CEST
Register…
SIG Workshop: Geotechnical Analysis – Working With 3D Deep Excavation in PLAXIS Presenter: Micha van der Sloot, Manager Technical Support, Geotechnical, Bentley Systems, Inc. Date/Time: Tuesday, May 12, 2020 at 10:00 AM and 4:00 PM Central European Summer…
Geotechnical Analysis Special Interest Group: Using SoilVision SVSLOPE to Determine the Factor of Safety Host: Micha van der Sloot, Technical Support Manager, Bentley Systems, Inc. Presenter: Marina Trevizolli, Senior Application Engineer, Bentley Systems…