Hi All,
Unfortunately I couldn't find any good reference for dewatering in excavation in 3D problems. Could you possibly tell me minimum layer thickness for Interpolate condition? Thank you so much.
Application
PLAXIS 2D
Version
PLAXIS 2D
Date created
20 May 2017
Date modified
27 Feb 2023
This example involves the dry construction of an excavation. The excavation is supported by concrete diaphragm walls. The…
Application
PLAXIS 2D
Version
PLAXIS 2D
Date created
20 May 2017
Date modified
27 Feb 2023
In this tutorial a Ultimate Limit State (ULS) calculation will be defined and performed for the submerged construction of…
Application
PLAXIS 2D
Version
PLAXIS 2D
Date created
20 May 2017
Date modified
27 Feb 2023
In this tutorial lowering the groundwater level and the flow around a sheetpile wall will be analysed. The geometry model…