I am in the process of conducting a dynamic analysis on a deep excavation (>28m). The water table is close to the surface and the excavation wall consists of secant wall and anchors. Therefore, I am running a coupled flow analysis during…
Hi. I have a multilevel excavation problem for which I want to use "create well" feature to pump out water before every level of excavation. Initial groundwater level is at 2 m below ground surface. The excavation is in 4 stages and final excavated level…
Hi,