• Discontinuities for the purpose of modelling contact of tunnel segments

    Jovan Saponjic
    Jovan Saponjic
    I am modelling a TBM-bored tunnel in Plaxis 2D, and in order to obtain a more percise stress field in the segmental lining in the zones of contact between segments, I have decided to model the tunnel lining as "soil" elements with the corresponding material…
    • 8 months ago
    • GeoStudio | PLAXIS
    • GeoStudio | PLAXIS Forum
  • Modelling Rock mass using discrete discontinuities vs Jointed Rock

    Micha van der Sloot
    Micha van der Sloot
    Application PLAXIS 2D Version PLAXIS 2D CONNECT Edition V22 Original Title Modelling rock discontinuities with Jointed Rock vs Discontinuity elements Original Author D. Waterman Publication year 2022 Date created…
    • over 1 year ago
    • GeoStudio | PLAXIS
    • GeoStudio | PLAXIS Wiki
  • View related content from anywhere
  • More
  • Cancel