• APM Indicators integrated with 4D Analytics not alarming in APM due to special character in UOM

    Joseph Marin
    Joseph Marin
    Product(s): APM Implementation and Performance Management Version(s): 7 Environment: N/A Area: N/A Subarea: N/A Problem Description An APM user with Assetwise Interop connection to 4D Analytics…
    • 5 months ago
    • Asset Reliability | AssetWise APM
    • Asset Reliability | AssetWise APM Wiki
  • Calculated indicators not calculating if asset status of non-operational

    Joseph Marin
    Joseph Marin
    Product(s): APM Implementation and Performance Management Version(s): 7 Environment: N/A Area: N/A Subarea: N/A Problem Description An APM user with a 4D analytics integration was experiencing…
    • over 1 year ago
    • Asset Reliability | AssetWise APM
    • Asset Reliability | AssetWise APM Wiki
  • Comparative analysis 4D trends of selected 4D indicators remain blank.

    Giselle Notte
    Giselle Notte
    Product(s): APM Implementation and Performance Management Version(s): N\A Environment: N\A Area: N/A Subarea: N\A Problem When creating an advanced comparative analysis 4D trends of selected…
    • over 1 year ago
    • Asset Reliability | AssetWise APM
    • Asset Reliability | AssetWise APM Wiki
  • How to change the default timeframe in 4D-Analytics tab

    Deborah Gardiner
    Deborah Gardiner
    Product(s): APM Implementation and Performance Management Version(s): N/A Environment: N/A Area: N/A Subarea: N/A Problem: In APM, the default time frame of the readings shown on the 4D-Analytics…
    • over 2 years ago
    • Asset Reliability | AssetWise APM
    • Asset Reliability | AssetWise APM Wiki
  • User can access APM but Indicator's 4D Analytics tab indicates a login failure

    Joseph Marin
    Joseph Marin
    Product(s): APM Implementation and Performance Management Version(s): 7.12.3 Environment: N/A Area: N/A Subarea: N/A Problem Description Whereas some users can access 4D Analytics tab on an…
    • 7 months ago
    • Asset Reliability | AssetWise APM
    • Asset Reliability | AssetWise APM Wiki
  • View related content from anywhere
  • More
  • Cancel