• short-term and long-term composite cross-section

    Dang Nguyen Khoa
    Dang Nguyen Khoa
    Hi all. In composite steel girder bridges with concrete decks (continuous span bridges), does RM bridge automatically Calculator effective width of deck to calculate short-term and long-term composite cross-sections? best regards.
    • 2 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Steel composite bridge

    Dang Nguyen Khoa
    Dang Nguyen Khoa
    Hi all. I hava some question about steel composite brige as follows: 1. To calculator stress point of section, Rm Bridge automatic use short-term section for live load and load case type Non-permanent and use long-term section for load case type Permanent…
    • 2 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Post-Tensioning of AASHTO I Girder Type LEAP Bridge Concrete

    Ave Robin Ramos
    Ave Robin Ramos
    June 24, 2017 Dear Engineers, Greetings for all structural engineers in the world. I'm a bridge engineer from the Philippines and currently connected in a consulting firm. I'm using Leap Bridge Concrete for less than a month and find out that it…
    • over 6 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • View related content from anywhere
  • More
  • Cancel