• short-term and long-term composite cross-section

    Dang Nguyen Khoa
    Dang Nguyen Khoa
    Hi all. In composite steel girder bridges with concrete decks (continuous span bridges), does RM bridge automatically Calculator effective width of deck to calculate short-term and long-term composite cross-sections? best regards.
    • 2 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Steel composite bridge

    Dang Nguyen Khoa
    Dang Nguyen Khoa
    Hi all. I hava some question about steel composite brige as follows: 1. To calculator stress point of section, Rm Bridge automatic use short-term section for live load and load case type Non-permanent and use long-term section for load case type Permanent…
    • 2 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Zero Steel Area provided at transfer

    Luis Hernández
    Luis Hernández
    Hello, I have a problem in the beam section analysis. I assigned rebars to the beam but the program says I have "0 Ast_prvd" at the transfer location and I want to know if there is any way to fix this or if there is a special setting I should look for…
    • Answered
    • over 2 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Arch Bridge - Rm bridge

    Due Due
    Due Due
    hello Everybody! At this time! Can you help me? How to draw " this member " of Arch Bridge in Rm-Bridge? Note: only is red lines in the picture.
    • Answered
    • over 4 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Detailed Design of Bridge with OBM (Open Bridge Modeller)

    Jaimin Patel
    Jaimin Patel
    Hi Experts, I am new to OBM, I have done a few tutorials from online learning material. I wanted to know if OBM is the solution to Bridge modeling? Could you do the full detailed design of the bridge including all the components? (eg. On-Structure…
    • Answered
    • over 4 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • LEAP Bridge - Precast/Prestressed Girder - 10th points

    Conner Doolan
    Conner Doolan
    Hello, Camber and deflections are reported at 10th points along the beam. I am modelling a longer span which will require more than 10 screed points. Is there a way to toggle the number of points? Or do I have to interpolate? Thanks,
    • over 5 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • how to make template?

    Eka Silitonga
    Eka Silitonga
    • over 6 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Detensioning Failure

    Stephen Fussnecker
    Stephen Fussnecker
    I have a single span bridge using I-girders that I need close to the max amount of strands in. These are all straight strands, and I've had to debond to 4 different lengths from the end. The longest debond is 25' of my ~90' girder. When I look at the…
    • Answered
    • over 8 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM