• LEAP Bridge - Precast/Prestressed Girder - 10th points

    Conner Doolan
    Conner Doolan
    Hello, Camber and deflections are reported at 10th points along the beam. I am modelling a longer span which will require more than 10 screed points. Is there a way to toggle the number of points? Or do I have to interpolate? Thanks,
    • over 5 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Girder length issue in Bridge Parametric Layout

    Usha Barooah
    Usha Barooah
    I am using Leap Bridge Concrete CONNECT Edition v17.01.01.07. I used ABC wizard to model a two span non continuous bridge (110'-104') with a 17.5 degree skew. The deck in span 1 is 66.6 ft while in span 2, it flares from 66.6ft in the interior bent to…
    • over 5 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • CONSPAN - Precast Girders at Interior Supports

    J. M.
    J. M.
    I am using CONSPAN in my design and have a couple of questions about the method in which the program performs calculations. Does CONSPAN design prestressed girders, at the interior supports, as reinforced concrete beams? According to AASHTO, LRFD 5.14…
    • over 6 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Detensioning Failure

    Stephen Fussnecker
    Stephen Fussnecker
    I have a single span bridge using I-girders that I need close to the max amount of strands in. These are all straight strands, and I've had to debond to 4 different lengths from the end. The longest debond is 25' of my ~90' girder. When I look at the…
    • Answered
    • over 8 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum