• LEAP Bridge - Precast/Prestressed Girder - 10th points

    Conner Doolan
    Conner Doolan
    Hello, Camber and deflections are reported at 10th points along the beam. I am modelling a longer span which will require more than 10 screed points. Is there a way to toggle the number of points? Or do I have to interpolate? Thanks,
    • over 5 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Floor Beam Live Load moment calculation in LARS

    Ryan Fehr
    Ryan Fehr
    I'm doing a rating of a Girder-Floorbeam-Stringer bridge in LARS (LFR). I hardcoded the input files to automatically create check points at section changes '[SectionChangeGenerateCheckPoints] 1', and that appears to work fine except for with the floor…
    • over 6 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • View related content from anywhere
  • More
  • Cancel