• LEAP Bridge - Precast/Prestressed Girder - 10th points

    Conner Doolan
    Conner Doolan
    Hello, Camber and deflections are reported at 10th points along the beam. I am modelling a longer span which will require more than 10 screed points. Is there a way to toggle the number of points? Or do I have to interpolate? Thanks,
    • over 5 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • Detensioning Failure

    Stephen Fussnecker
    Stephen Fussnecker
    I have a single span bridge using I-girders that I need close to the max amount of strands in. These are all straight strands, and I've had to debond to 4 different lengths from the end. The longest debond is 25' of my ~90' girder. When I look at the…
    • Answered
    • over 8 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum