• transverse post tensioning in adjacent box beam

    Ross Anderson
    Ross Anderson
    Why is the "Post-Tensioned" check box not visible in the Geometry tab as shown in Tutorial T5 Step 5. In LEAP Bridge Concrete, an adjacent box beam bridge was generated using the ABC interface.
    • Answered
    • 2 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Forum
  • View related content from anywhere
  • More
  • Cancel