• Hand modification to catch basin produces the same spread output value
    Jennifer Balk
    Good morning. We have placed a catchment by picking points. We analyzed our intake spacing by checking the spread report. The spread value was too high. We then modified the catchment, by hand, and spaced...
  • Unable to assign longitudinal slope to on grade inlet in open road designer/sewergems
    Snehal Kamuni
    Unable to assign longitudinal slope to on grade inlet in open road designer/sewergems