• 1. Static Calculation: usual structural analysis

    MarcosBeier
    MarcosBeier
    For RM Bridge inside OpenBridge Designer, at Analyzer Analyzer /Schedule/Stages/Schedule Actions/ Static Calculation the users will find the available standard static structural analysis: Calc : Calculate static load Stress : Activate and calculate…
    • 9 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • Tendon Actions: Prestressing Tendon Loads

    MarcosBeier
    MarcosBeier
    For RM Bridge, inside OpenBridge Designer, at Analyzer Analyzer/Schedule /Load Definition/Tendon Load the users will find the internal PT cable loading actions to be defined within a group of prestressing tendons defined by the selected Stress Label …
    • 9 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • RM Bridge Analyzer: Schedule

    MarcosBeier
    MarcosBeier
    Inside Analyzer, in the analysis component of RM Bridge Enterprise CONNECT Edition , users can work on the model's Construction Load and Schedule definitions as listed and shown in the image below from the Menu Tree. Load Definition - subfunctions…
    • 9 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • Sup Actions Rules

    MarcosBeier
    MarcosBeier
    Sup Actions are the possible action commands to deal with Superposition of envelopes or Load Case results files. The most important are: SupADD – Unconditional add; SupAND – Add if unfavorable; SupANDX – Add if unfavorable with both…
    • over 1 year ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • 5. LC/Envelope Actions

    MarcosBeier
    MarcosBeier
    The LC/Envelope actions are manipulations of the calculated results applied for the Load Cases (LC) and the Envelopes superposition files (Sup), as management actions to create new files that will include the desired values. They're listed below and more…
    • 9 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • RM Bridge: Stages

    MarcosBeier
    MarcosBeier
    Stages are where the construction stages are listed. At the bottom table, there are two options: Activation : where each stage elements are activated and; Schedule Actions : where the sequence of calculation actions are performed.
    • 1 month ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • View related content throughout LARS | LEAP | OpenBridge | OpenTunnel | RM
  • More
  • Cancel