• LARS LFD Non Composite Steel Verification

    Dilip Matange [Bentley]
    Dilip Matange [Bentley]
    LARS LFD Non Composite Steel Verification Structure ID = 1311151 Member ID = G13 Checkpoint = 1.5 1) Inventory moment capacity for top fiber +bend for G02 at checkpoint 1.5 is 681.8C ft-kips as circled in the report below. “C” denotes “Compact…
    • over 2 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • View related content throughout LARS | LEAP | OpenBridge | OpenTunnel | RM
  • More
  • Cancel