• 6. Moving Load - Two-span Bridge

    Ana Carla Peres
    Ana Carla Peres
    The Demo Example number 6. Moving Load - Two-span Bridge has a THA - Time History Analysis of a Moving Load for a very simplified structure including damping. The structural system simulates a steel composite two spans bridge and Rayleigh-Damping coefficients…
    • 9 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • 8 Dynamic Analysis and Time History Calculation 1

    MarcosBeier
    MarcosBeier
    The Verification Example 8 Dynamic Analysis and Time History Calculation 1 has the objective to check the functionality of the dynamic features of Eigenmodes and Time History on a very simple 1 Degree Of freedom beam. The structural model for that purpose…
    • over 1 year ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • 6 Dynamic Analysis and Time History Calculation

    MarcosBeier
    MarcosBeier
    The objective of this Verification Example: 6. Dynamic Analysis and Time History Calculation is to verify the functionality of the dynamic features necessary to obtain a THA: Eigenanalysis and time history. Four different analyses are performed to demonstrate…
    • over 1 year ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • FAQ: Accelerations and velocities report

    MarcosBeier
    MarcosBeier
    When using THA - Time History Analysis it is a common question from RM Bridge users how to include acceleration and velocity in the dynamic analysis report. Though velocity and acceleration are not primary results, but intermediate calculation values…
    • 1 month ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • RM Bridge Dynamics

    Ana Carla Peres
    Ana Carla Peres
    Dynamic Analysis in RM Bridge is a very important feature as the program concept is to perform dynamic analyses within the schedule, together with static analyses on the same model and in accordance with the active construction stage. As there is not…
    • 4 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • 10. RStock - Rolling Stock / Bridges for HSR - High Speed Rail

    MarcosBeier
    MarcosBeier
    The 10th Training Example option in RM Bridge Enterprise is 10. RStock - Rolling Stock and it's an advanced training example for a series of dynamic analyses of a bridge model under an HSR - High-Speed Rail system. It can be accessed under File\Example…
    • over 1 year ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • View related content throughout LARS | LEAP | OpenBridge | OpenTunnel | RM
  • More
  • Cancel