• “UltSup” Reinforcement Design

    MarcosBeier
    MarcosBeier
    In schedule action “UltSup” with Reinforcement design selected, program calculates the necessary reinforcement area amount, required for the ultimate check capacity of the cross-section. Presuming a plane strain over the cross-section, and a nonlinear…
    • 8 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • “UltSup Schedule Action

    MarcosBeier
    MarcosBeier
    In RM Bridge Enterprise, User can perform the ultimate limit check for a specified envelope based on the stress-strain diagrams of materials and calculates, if requested, the required reinforcement amount ( ULS reinforcement design ). The following…
    • 8 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • New Plot Action (PIEIUlt) for plotting ultimate bending capacity in the cross-sections for load cases and envelopes

    Ana Carla Peres
    Ana Carla Peres
    New schedule action for plotting ultimate bending capacity in the cross-section for load cases and envelopes is now available. Users can now plot the list files results (.lst) and will be able to quickly check if the ultimate capacity is achieved in the…
    • over 2 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • PSC Bridge Design - RM Bridge: Reinforcements Definition

    Ana Carla Peres
    Ana Carla Peres
    RM > Modeler > Cross Section > Reinforcement Types Longitudinal reinforcement for cracking, bending ….. Shear reinforcement for web on shear calculation. Shear longitudinal reinforcement for shear calculation. Torsion reinforcement for torsion…
    • over 2 years ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • RM Bridge: Bending, Cracking & Longitudinal Reinforcements

    Ana Carla Peres
    Ana Carla Peres
    Bending Reinforcement with Schedule Actions: UltSup or UltLc. A selection of elements for performing the ultimate capacity check can be done Structure > Elements > Checks. The following requirements already exist for performing these schedule actions…
    • 4 months ago
    • LARS | LEAP | OpenBridge | OpenTunnel | RM
    • LARS | LEAP | OpenBridge | OpenTunnel | RM Wiki
  • View related content throughout LARS | LEAP | OpenBridge | OpenTunnel | RM
  • More
  • Cancel